639 chars; verbs=true — Wiring of the Esso cord, core cap, and installation of the four-square box for the 11 box has been completed. Collection can now proceed. Install customer provi
Job #9032
639 chars; verbs=true — Wiring of the Esso cord, core cap, and installation of the four-square box for the 11 box has been completed. Collection can now proceed. Install customer provi
0 photo signals (need 5 for install) [API proxy — warn only]
Fix: Attach at least 5 photos for this install job (before/after for coil cleaning / filter changes).
ServiceTitan API did not expose attachments; scored as warning until media endpoints are wired.
Parts/materials named in notes
Lead: Andrew Lincoln
No signature form/note signal [API proxy — warn only]
Fix: Collect customer signature on the job before marking complete.
Signature not API-confirmable yet; warning only until forms/attachments are wired.
Wiring of the Esso cord, core cap, and installation of the four-square box for the 11 box has been completed. Collection can now proceed. Install customer provided ASCO 63 and Core Cap equipment. 1. Arrive on-site and verify the company-provided equipment and installation requirements. 2. Complete all necessary electrical connections and tie-ins for the ASCO 63 and Core Cap equipment. 3. Secure and terminate all electrical connections as required. 4. Verify connections are properly completed and equipment is ready for operation. 5. Test the completed installation and confirm proper operation. 6. Clean the work area upon completion.